Receive-after-transmit time delay

From Wikipedia
Revision as of 00:55, 16 September 2024 by imported>Kvng (avoid unnec redirect)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

TemplateStyles' src attribute must not be empty.

In telecommunications, receive-after-transmit time delay is the time interval between (a) the instant of keying off the local transmitter to stop transmitting and (b) the instant the local receiver output has increased to 90% of its steady-state value in response to an RF signal from another transmitter.

The RF signal from the distant transmitter must exist at the local receiver input prior to, or at the time of, keying off the local transmitter.

Receive-after-transmit time delay applies only to half-duplex operation.

See also

References

Public Domain This article incorporates public domain material from the General Services Administration document: "Federal Standard 1037C". (in support of MIL-STD-188)